安装通风管道前的6个准备工作

来源:http://www.jntfgd.com 日期:2021-06-29 发布人:admin

通风管道在现代建筑中必不可少,它的的作用也是非常强大,山东通风管道厂家提醒大家安装通风管道前要做好6个准备工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根据所需安装通风管道的场所结构及环境,进行通风管道设计,确保通风管道的实用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排风系统和空调系统的通风管道安装,需在建筑物的屋面做完,安装部位的障碍物已涪理干净的条件下进行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除尘系统通风管道安装,需在厂房内与风管有关的工艺设备安装完毕,设备的接管或吸、排尘罩位置已定的条件下进行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工准备工作已做好,如施工工具、吊装机械设备、必要的脚手架或升降安装平台已齐备施工用科已能满足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要与土建施工密切配合,应预图的安装孔洞,预埋的支架构件均已完好,并经检查符合设计要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通风及空调系统管路组成的各种通风管道、部件、配件均已加工完毕,并经质量检查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通风管道只有在安装前做好准备才能保证后期安装顺利,也减少后期通风管道使用过程中问题的发生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage通风管道在现代建筑中必不可少,它的的作用也是非常强大,山东通风管道厂家提醒大家安装通风管道前要做好6个准备工作:
Ventilation duct is indispensable in modern architecture, and its role is also very powerful. Shandong ventilation duct manufacturers remind you to make six preparations before installing ventilation ducts
1、根据所需安装通风管道的场所结构及环境,进行通风管道设计,确保通风管道的实用性。
1. According to the structure and environment of the place where the ventilation pipe needs to be installed, the ventilation pipe is designed to ensure the practicability of the ventilation pipe.
2、一般送排风系统和空调系统的通风管道安装,需在建筑物的屋面做完,安装部位的障碍物已涪理干净的条件下进行。
2. In general, the installation of ventilation pipes for air supply and exhaust system and air conditioning system should be carried out under the condition that the roof of the building is finished and the obstacles at the installation position have been cleared.
3、一般除尘系统通风管道安装,需在厂房内与风管有关的工艺设备安装完毕,设备的接管或吸、排尘罩位置已定的条件下进行。
3. Generally, the installation of the ventilation pipe of the dust removal system should be carried out after the installation of the process equipment related to the air pipe in the plant and the position of the equipment connecting pipe or dust suction and discharge hood has been determined.
4、施工准备工作已做好,如施工工具、吊装机械设备、必要的脚手架或升降安装平台已齐备施工用科已能满足要求。
4. The construction preparation work has been done well, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform are complete, and the construction department can meet the requirements.
5、要与土建施工密切配合,应预图的安装孔洞,预埋的支架构件均已完好,并经检查符合设计要求。
5. To closely cooperate with the civil construction, the installation holes in the drawing and the embedded support components are in good condition and meet the design requirements after inspection.
6,通风及空调系统管路组成的各种通风管道、部件、配件均已加工完毕,并经质量检查合格。
6. All kinds of ventilation pipes, components and accessories composed of ventilation and air conditioning system pipes have been processed and passed the quality inspection.
通风管道只有在安装前做好准备才能保证后期安装顺利,也减少后期通风管道使用过程中问题的发生
Only when the ventilation pipe is well prepared before installation, can it be installed smoothly in the later stage and reduce the occurrence of problems in the use of the ventilation pipe in the later stage
上一篇:通风管道对于我们生活起到什么样作用?
下一篇:济南通风管道安装都包括哪些步骤?