首先,为了使施工的效果更好,我们应制定一些严格的实行措施。点,就是在施工前,根据施工的要求和施工的现场环境画出施工图和组织设计方案,并且在实施过程中严格按照施工图和组织设计方案进行操作,不可随意更改。
First of all, in order to make the construction effect better, we should formulate some strict implementation measures. The first point is to draw the construction drawing and organization design scheme according to the construction requirements and the construction site environment before construction, and operate in strict accordance with the construction drawing and organization design scheme during the implementation process, which cannot be changed at will.
第二点,对于施工中所要用到的材料质量应进行检验,如查看相关的合格证书,没有问题后才可以用到施工中。
Second, the quality of the materials used in the construction shall be inspected, such as checking the relevant certificate of conformity, which can only be used in the construction after there is no problem.
第三点,施工中应严格按照国家出行的相关规定进行施工,从而保证施工的安全性。
Thirdly, the construction should be carried out in strict accordance with the relevant provisions of the state travel, so as to ensure the safety of the construction.
第四点,对于施工中的人员的技术应进行指导,让其掌握施工中的要领并进行实地的测量,记录相关的测量数据,提高施工的质量。
Fourth, for the construction of personnel technology should be guided, let them master the essentials of construction and field measurement, record the relevant measurement data, improve the quality of construction.
第五点,依照合理的程序进行施工,检查中发现问题要及时返修并予以相关的指导。
Fifthly, the construction shall be carried out in accordance with reasonable procedures. Problems found in the inspection shall be repaired in time and relevant guidance shall be given.
第六点,完善施工中的奖惩制度,在确保每个施工员的安全的情况下,对认真工作的施工员进行相应的奖励,从而鼓励大家重视施工的整体质量。
Sixth, improve the reward and punishment system in the construction, and reward the construction workers who work hard to ensure the safety of each construction worker, so as to encourage everyone to pay attention to the overall quality of construction.
,在施工结束后相关的人员应仔细检查施工记录,对出现的问题及时提出并解决,确认没有问题后,再进行交底工作。
Finally, the relevant personnel shall carefully check the construction records after the completion of construction, put forward and solve the problems in time, and carry out the disclosure work after confirming that there are no problems.