济南通分管道:通风管道工程安装工艺

来源:http://www.jntfgd.com 日期:2024-10-14 发布人:创始人

  通风管道工程安装工艺

  Installation process of ventilation duct engineering

  1通风管道工程施工准备1、作业条件(1)一般送风机系统和空调系统的安装,要在建筑物围护结构施工完,障碍物已清理,地面无杂物的条件下进行。(2)对空气洁净系统的安装,应在建筑物内部安装部件的地面已做好,墙面已抹灰完毕,室内无灰尘飞扬或有防尘措施的条件下进行。(3)一般除尘系统风管安装宜在厂房的工艺设备安装完或设备基础已确定,设备连接器、罩体方位已知的情况下进行。(4)检查现场预留孔洞位置、尺寸应符合图纸要求,每边比实际截面大100mm。(5)作业地点要有相应的辅助设施,如梯子、架子、安全防护、消防器材,并有施工员的技术、质量、安全交底。

  1. Preparation for Construction of Ventilation Duct Engineering 1. Operating Conditions (1) The installation of the general air supply fan system and air conditioning system should be carried out after the construction of the building enclosure structure is completed, obstacles have been cleared, and there are no debris on the ground. (2) The installation of the air purification system should be carried out on the floor where the components are installed inside the building, the walls have been plastered, and there is no dust flying or dust prevention measures in the room. (3) The installation of air ducts for general dust removal systems should be carried out after the installation of process equipment in the factory or when the equipment foundation has been determined and the orientation of the equipment connectors and covers is known. (4) The position and size of the reserved holes on site should meet the requirements of the drawings, and each side should be 100mm larger than the actual cross-section. (5) The work site should have corresponding auxiliary facilities, such as ladders, shelves, safety protection, fire-fighting equipment, and technical, quality, and safety briefings for construction workers.

  2、材质要求(1)各种安装材料应具有出厂合格证明书或质量鉴定文件及产品清单。(2)风管成品不允许有变形、扭曲、开裂、孔洞、法兰脱落、开焊、漏铆、漏打螺栓孔等缺陷:(3)安装的阀体、风口等部件应检查调节装置是否灵活,消声片、油漆层有无损伤。(4)安装使用的材料:螺栓、螺母、垫圈、垫料、密封条、自攻螺钉,拉铆钉,焊条、各种帆布、无纺布、射钉、膨胀螺栓应符合产品质量要求。

  2. Material requirements: (1) All installation materials should have factory certificates of conformity, quality appraisal documents, and product lists. (2) Finished air ducts are not allowed to have defects such as deformation, distortion, cracking, holes, flange detachment, open welding, missing rivets, missing bolt holes, etc.: (3) The installed valve body, air outlet and other components should be checked for flexibility of the adjustment device, and for damage to the sound-absorbing film and paint layer. (4) The materials used for installation: bolts, nuts, washers, gaskets, sealing strips, self tapping screws, rivets, welding rods, various canvases, non-woven fabrics, nails, and expansion bolts should meet the product quality requirements.

  3、工器具主要工器具有:手锤、电锤、手电钻、手锯、电动双刃剪、砂轮锯、角向磨光机、台钻、电气焊具、扳手、改锥、手剪、倒链、高凳、大绳、尖冲、射钉枪、刷子等。2通风管道工程工艺流程1、镀锌薄钢管风管制作展开下料 → 剪切 → 倒角→ 咬口制作 → 风管折方 → 成型 → 法兰下料 → 法兰焊接 → 法兰打眼冲孔 → 铆接翻边;2、镀锌薄钢管风管、不锈钢风管安装风管搬运 → 支吊架安装 → 干管安装 → 立管安装 → 支管安装 → 漏光及漏风量检测 → 隐蔽工程验收 → 防腐保温 → 单机调试 → 综合调试;

  3. The main tools include: hand hammer, electric hammer, hand drill, hand saw, electric double-edged shear, grinding wheel saw, angle grinder, bench drill, electrical welding tool, wrench, screwdriver, hand shear, reverse chain, high stool, rope, pointed punch, nail gun, brush, etc. 2. Process flow of ventilation duct engineering: 1. Production and unfolding of galvanized thin steel pipe air duct ->cutting ->chamfering ->bite production ->duct folding ->forming ->flange cutting ->flange welding ->flange drilling and punching ->riveting and flanging; 2. Installation and transportation of galvanized thin steel pipe and stainless steel pipe, installation of support and hanger, installation of main pipe, installation of vertical pipe, installation of branch pipe, detection of light and air leakage, acceptance of concealed works, anti-corrosion and insulation, single machine commissioning, comprehensive commissioning;

  3、HDPE双壁波纹管安装材料验收 → 风管下料 → 制作 → 焊接 → 加固 → 测试 → 隐蔽工程验收 → 调试。

  3. HDPE double wall corrugated pipe installation material acceptance → duct cutting → fabrication → welding → reinforcement → testing → concealed engineering acceptance → commissioning.

  3通风管道工程操作工艺1、标高按设计要求并参照土建基准线找出风管标高。

  3. Operation process of ventilation duct engineering: 1. Determine the elevation of the air duct according to the design requirements and refer to the civil engineering reference line.

  2、制作、吊架(1)按照风管系统所在的空间位置,确定风管的支吊架开式并参照华北标办图集《通风与空调工程:91SB6》的用料规格和做法制作。(2)风管支、吊架的制作应注意的问题:① 支架的悬臂、吊架的吊铁采用角钢或槽钢制成,斜撑的材料为角钢,吊杆采用圆钢,扁铁用来制作抱箍。② 钢材切断和打孔,不应使用氧气—乙炔切割。支架的焊缝必须饱满。③ 吊杆圆钢应根据风管安装标高适当截取,两端套丝不宜过长。④ 支吊架制作完毕后,应进行除锈和刷防锈漆。(3)吊点的设置:用膨胀螺栓法:特点是施工灵活、准确、快速。

  2. Production and hanger (1) Determine the support and hanger opening of the air duct according to the spatial position of the air duct system, and refer to the material specifications and methods in the North China Standard Atlas "Ventilation and Air Conditioning Engineering: 91SB6" for production. (2) Precautions for the fabrication of air duct supports and hangers: ① The cantilever of the support and the hanging iron of the hanger are made of angle steel or channel steel, the slant support is made of angle steel, the suspender is made of round steel, and the flat iron is used to make hoop. ② Oxygen acetylene cutting should not be used for cutting and punching steel. The weld seam of the bracket must be full The round steel of the suspension rod should be cut appropriately according to the installation elevation of the air duct, and the threading at both ends should not be too long After the production of the support and hanger is completed, rust removal and anti rust paint should be applied. (3) Setting of suspension points: using expansion bolt method: characterized by flexible, accurate, and fast construction.

  3、安装吊架(1)按风管的中心线,找出吊杆敷设位置,单吊杆在风管中的中心线上,双吊杆可以按托盘的螺孔间距或风管的中心线对称安装。(2)吊杆根据吊件形式,用螺母拧在槽钢挂件上。(3)当风管较长时,需要安装一排支架时,可先把两端安好,然后以两端的支架为基准,用拉线法找出中间支架的标高进行安装。(4)立管管卡安装时,应先把最上面的一个管件固定好,再用线锤在中心处吊线,下面的管卡即可按线进行固定。(5)支、吊架安装应注意的问题:① 支、吊架的标高必须正确,如圆形风管管径由大变小,为保证风管中心线水平,支架型钢上表面标高,应作相应提高。② 风管支吊架间距如无设计要求时,对不保温风管应符合表2的要求。对于保温风管、支、吊架间距无设计要求时,按表2间距要求值乘以0、85。螺旋风管的支、吊架间距可以适当增加。③ 支吊架不得安装在风口、阀门检查孔等处,以免妨碍操作,吊架不得直接吊在法兰上。④ 保温风管不能直接与支吊架接触,应垫上坚固的隔热材料、其厚度与保温相同,防止产生"冷桥"。20190610092947300

  3. Install the hanger (1) according to the centerline of the air duct, find the position for laying the hanger. The single hanger is on the centerline of the air duct, and the double hanger can be symmetrically installed according to the spacing between the screw holes of the tray or the centerline of the air duct. (2) The suspension rod is screwed onto the channel steel hanger with a nut according to the form of the hanger. (3) When the air duct is long and a row of brackets need to be installed, the two ends can be installed first, and then the elevation of the middle bracket can be found using the wire drawing method based on the brackets at both ends for installation. (4) When installing the riser pipe clamp, the topmost pipe fitting should be fixed first, and then a plumb bob should be used to hang the line at the center. The lower pipe clamp can be fixed according to the line. (5) Attention should be paid to the installation of supports and hangers: ① The elevation of supports and hangers must be correct. For example, if the diameter of a circular air duct changes from large to small, in order to ensure that the centerline of the air duct is horizontal, the elevation of the upper surface of the support steel should be correspondingly increased. ② If there are no design requirements for the spacing between air duct supports and hangers, non insulated air ducts should comply with the requirements in Table 2. When there are no design requirements for the spacing between insulated ducts, supports, and hangers, multiply the spacing requirements in Table 2 by 0 and 85. The spacing between the supports and hangers of spiral ducts can be appropriately increased Support hangers shall not be installed at air vents, valve inspection holes, etc. to avoid hindering operation, and hangers shall not be directly hung on flanges Insulated ducts should not be in direct contact with supports and hangers, and should be padded with sturdy insulation material of the same thickness as the insulation to prevent the formation of "cold bridges".

  4、聚氯乙烯风管安装聚氯乙烯风管也与钢板风管一样采用支、吊托架,但一般以吊架为主,支架间距按要求制作安装,但需做好以下几点:(1)当支管较长时,则应在靠近于管的一端设置一支架。(2)支架的抱箍制作应与风管留有一定间隙,便于风管伸缩。5、风管排列安装(1)法兰连接为保证法兰接口严密性,法兰之间应有垫料。(2)垫料8501密封胶带使用方法① 将风管法兰表面的异物和积水清理掉,并擦干净。② 从法兰一角开始粘贴胶带,胶带端头应略长于法兰。③ 沿法兰均匀平整地粘贴,并在粘贴过程中用手将其按实,不得脱落,接口处要严密,各部位均不得凸人风管内,沿法兰粘贴一周后与起端交叉搭接,剪去多余部分。

  4. The installation of PVC air ducts also uses support and suspension brackets like steel plate air ducts, but generally relies on hangers. The spacing between brackets should be made and installed according to requirements, but the following points should be taken into account: (1) When the branch pipe is long, a bracket should be set up near the end of the pipe. (2) The clamp of the bracket should be made with a certain gap between it and the air duct to facilitate the expansion and contraction of the air duct. 5. Installation of air duct arrangement (1) Flange connection: To ensure the tightness of the flange interface, there should be padding between the flanges. (2) Instructions for using gasket 8501 sealing tape: ① Clean the foreign objects and accumulated water on the surface of the air duct flange and wipe it clean. ② Starting from one corner of the flange, stick the tape, and the end of the tape should be slightly longer than the flange Paste evenly and smoothly along the flange, and press it firmly by hand during the pasting process without falling off. The interface should be tight, and no part should protrude into the air duct. After pasting along the flange for one week, cross and overlap with the starting end, and cut off the excess part.④ 剥去隔离纸。(3)法兰连接法兰连接时,要求规定垫料,把两个法兰对正,穿螺栓并戴上螺母,(注意:螺母要在同一侧),暂时不要上紧,直到所有螺栓都穿上后,再把螺栓拧紧。连接好风管,应以两端法兰为准,拉线检查风管连接是否平直。(4)垫法兰垫料和法兰连接时,应注意的问题:① 正确选用垫料,避免用错垫料。② 法兰表面应干净无异物。③ 法兰垫料不能挤入或凸入管内,否则会增大流动阻力,增加管内积尘。④ 法兰连接后,严禁往法兰缝隙填塞垫料。⑤ 连接法兰的螺母应在同一侧。⑥ 不锈钢法兰连接用螺栓,宜用同材质不锈钢螺栓。⑦ 铝板风管法兰连接应采用镀锌螺栓,并在法兰两侧垫镀锌垫圈。⑧ 聚氯乙烯风管法兰和玻璃钢法兰连接采用镀锌螺栓。(5)风管排列无法兰连接① 抱箍式连接:主要用于钢板圆风管和螺旋风管连接,先把每一管段的两端轧出鼓筋,并使其一端缩为小口。安装时按气流方向把小口插入大口,外面用钢制抱箍将两个端的鼓箍抱紧连接,最后用螺栓穿在耳环中间固定拧紧。② 插接式连接:主要用于矩形或圆形风管连接。先制作连接管,然后插入两侧风管,再用拉铆钉将其紧密固定。③ 插条式连接:主要用于矩形风管连接。将不同形式的插条插入风管两端,然后压实。其形状和接管方法见图。④ 软管式连接:主要用于风管与部件(如散热器、静压箱侧送风口等)的相连。安装时,软管两端套在连接的管外,然后用特别软卡把软管箍紧。

  ④ Peel off the isolation paper. (3) When connecting flanges, it is required to specify the padding, align the two flanges, thread the bolts and nuts (note: the nuts should be on the same side), and temporarily do not tighten them until all the bolts are threaded, then tighten the bolts. After connecting the air duct, the flanges at both ends should be used as a reference. Use a wire to check if the air duct connection is straight. (4) When using gasket materials and flange connections, attention should be paid to the following issues: ① Select the gasket materials correctly to avoid using the wrong ones. ② The flange surface should be clean and free of foreign objects The flange gasket should not be squeezed or protruding into the pipe, otherwise it will increase the flow resistance and increase the accumulation of dust inside the pipe After flange connection, it is strictly prohibited to fill the gap of the flange with padding. ⑤ The nuts connecting the flanges should be on the same side Stainless steel flange connection bolts should be made of the same material as stainless steel bolts The flange connection of aluminum plate air ducts should use galvanized bolts, and galvanized washers should be placed on both sides of the flange The connection between PVC duct flange and fiberglass flange adopts galvanized bolts. (5) Air duct arrangement without flange connection ① Clamp type connection: mainly used for connecting steel plate round air ducts and spiral air ducts. First, roll out bulging ribs at both ends of each pipe section and shrink one end into a small mouth. During installation, insert the small opening into the large opening in the direction of the airflow, and use steel clamps to tightly connect the two ends of the drum hoops. Finally, use bolts to secure and tighten them in the middle of the earrings Plug in connection: mainly used for connecting rectangular or circular air ducts. First, make the connecting pipe, then insert the air ducts on both sides, and tightly fix them with rivets Strip connection: mainly used for connecting rectangular ducts. Insert different forms of inserts into both ends of the air duct and compact them. The shape and connection method are shown in the figure. ④ Flexible hose connection: mainly used for connecting air ducts and components (such as radiators, static pressure box side air outlets, etc.). During installation, the two ends of the hose should be placed outside the connected pipe, and then the hose should be tightened with a special soft clamp.

  6、风管安装就位根据现场情况,可以在地面连成一片的长度,用吊装的方法就位,也可以把风管一节一节地放在支架上,逐节连接。一般顺序是先干管,后支管。立管的安装一般是由下向上安装。安装就位后进行找平,找正,达到设计规定的要求。风管安装应注意的问题:(1)风管采用无法兰连时,接口处应严密、牢固。矩形风管四角必须有定位及密封措施。风管连接两平面应平直,不得错位及扭曲。(2)安装在支架上的圆形风管应设托座。(3)风管穿出屋面外应设置防雨罩。(4)输送易产生冷凝水的风管,应按设计要求的坡度安装。风管底部不能有纵向接缝,如有接缝应用密封处理。(5)钢板风管与砖、混凝土风道的插接应顺应气流方向风管与风道结合面必须进行密封处理。(6)保温风管的支、吊架宜设在保温层外部,并不得损坏保温层。(7)送风管和与总管采用垂直插接时,接口处应设置导风调节装置。

  6. According to the on-site situation, the installation of air ducts can be connected to a length on the ground and placed in place by lifting. Alternatively, the air ducts can be placed section by section on the bracket and connected section by section. The general order is to start with the main pipe and then proceed with the branch pipe. The installation of risers is generally done from bottom to top. After installation, level and align to meet the design requirements. Attention should be paid to the installation of air ducts: (1) When the air duct cannot be connected by flange, the interface should be tight and firm. Rectangular air ducts must have positioning and sealing measures at the four corners. The connection between the two planes of the air duct should be straight, without misalignment or distortion. (2) Circular air ducts installed on brackets should be equipped with brackets. (3) Rainproof cover should be installed when the air duct passes outside the roof. (4) Ducts that are prone to condensation during transportation should be installed at the slope required by the design. There should be no longitudinal seams at the bottom of the air duct. If there are seams, they should be sealed. (5) The connection between steel plate air ducts and brick or concrete air ducts should conform to the direction of airflow. The joint surface between the air duct and the air duct must be sealed. (6) The support and hanger of the insulated air duct should be located outside the insulation layer and should not damage the insulation layer. (7) When the air supply duct and the main pipe are vertically connected, an air guide adjustment device should be installed at the interface.

  7、风管的严密性检验风管安装完毕后,应按系统压力等级进行严密性检验,漏风量应符合国家规范《通风与空调工程施工验收规范》GB50243—2002中的要求,系统的严密性检验应符合GB50243-2002规范附录A漏光法检测和漏风量测试的规定。低压系统的严密性检验宜采用抽检,抽检率为5%且抽检不少于一个系统。在加工工艺及漏光检测不合格时,应按规定的抽检率做漏风量测试。中压系统的严密性检验,应在严格的漏光检测合格条件下,对系统风管漏风量进行抽检,抽检率为20%,且抽检不少于一个系统。高压系统应全数进行漏风量测试。系统风管漏风量测试被抽检系统应全数合格。如有不合格,应加倍抽检,直至全数合格。

  7. After the installation of the air duct is completed, the tightness inspection of the air duct should be carried out according to the system pressure level. The air leakage rate should comply with the requirements of the national standard "Code for Construction Acceptance of Ventilation and Air Conditioning Engineering" GB50243-2002. The tightness inspection of the system should comply with the provisions of Appendix A of GB50243-2002 for light leakage method detection and air leakage rate testing. The tightness inspection of low-voltage systems should be carried out by sampling, with a sampling rate of 5% and no less than one system sampled. When the processing technology and light leakage detection are not qualified, air leakage testing should be conducted according to the prescribed sampling rate. The tightness inspection of the medium voltage system should be carried out under strict light leakage detection conditions, with a sampling rate of 20% for the air leakage of the system ducts, and no less than one system should be sampled. All high-voltage systems should undergo air leakage testing. The system's air duct leakage test should be fully qualified for all sampled systems. If there are any non conformities, double the sampling should be carried out until all are qualified.

  8、成品保护(1)安装完的风管要保证表面光滑洁净,室外风管应有防雨、防雪措施。(2)风管伸入结构风道时,其末端应安装上钢板网,防止系统运行时,杂物进入金属风管内。金属风管与结构风道缝隙应封堵严密。(3)风管穿越沉降缝时应按设计要求加设套管,套管与风管的间隙用填料(软质)封堵严密。(4)运输和安装不锈钢,铝板风管时,应避免产生刮伤表面的现象,安装时,尽量减少与铁质物品接触。(5)运输和安装阀件时,应避免由于碰撞而产生的执行机构和叶片变形。露天堆放应有防雨、防雪措施。

  8. Finished product protection (1) The installed air duct should ensure a smooth and clean surface, and outdoor air ducts should have rain and snow protection measures. (2) When the air duct extends into the structural air duct, a steel mesh should be installed at its end to prevent debris from entering the metal air duct during system operation. The gaps between metal ducts and structural air ducts should be tightly sealed. (3) When the air duct passes through the settlement joint, a sleeve should be added according to the design requirements, and the gap between the sleeve and the air duct should be tightly sealed with filler (soft). (4) When transporting and installing stainless steel and aluminum plate ducts, the phenomenon of scratching the surface should be avoided, and contact with iron objects should be minimized as much as possible during installation. (5) When transporting and installing valve components, precautions should be taken to avoid deformation of the actuator and blades caused by collisions. Outdoor storage should have measures to prevent rain and snow.

  本文由 济南通风管道 友情奉献.更多有关的知识请点击 http://www.jntfgd.com/真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.

  This article is a friendly contribution from Jinan ventilation ducts. For more related knowledge, please click http://www.jntfgd.com/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned